The video shows the work of the Russian military mobile sawmill complex VMLK-1. The VMLK-1 complex was developed by the Proekt Tekhnika company and entered service in 2016. The principle of operation of the sawmill complex is as follows: a chassis with an installed container body arrives at the forest cutting site, where it is deployed in 1.5 hours. The container body is removed from the Kamaz 63501 vehicle; it houses a sawmill frame with a capacity of up to 60 cubic meters of timber per shift. The chassis has a crane and quick-release supports. All this makes it possible in the field to carry out not only sawing of logs, but also all the necessary work - from felling timber to delivery of finished products. The container also provides sleeping places for personnel to rest. The maximum diameter of sawn logs is up to 50 centimeters. The sawmill is powered by a 100 kW electric unit; the VMLK-1 installation is serviced by 3 people.